Sign In | Join Free | My himfr.com
Home > Crawler Crane >

1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects from wholesalers
     
    Buy cheap 1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects from wholesalers
    • Buy cheap 1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects from wholesalers

    1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects

    Ask Lasest Price
    Brand Name : SANY
    Model Number : SCC3200A-1
    Price : Negotiable Price
    Payment Terms : L/C,T/T
    Supply Ability : Supply According to Customer Needs
    Delivery Time : According to Order Confirmation
    • Product Details
    • Company Profile

    1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects

    Crawler Cranes For All Lifting Projects, Suitable For The Price, Used Equipment



    SCC3200A-1 Crawler Crane Technical Specifications


    Maxi rated load: 320t
    Max lifting moment: 1820t·m
    Longest main boom: 86m
    Longest fixed jib condition: 62m+42m
    Longest luffing jib working condition: 62m+60m


    Product Specifications


    Fixed jib

    . The fixed jib has variable cross-sections at both ends and a space truss structure with equal cross-section in the middle. The steel pipes are welded, and the top and root of the jib are reinforced with steel plates, which is more conducive to load transmission;

    . The length of the fixed jib is between 13m and 42m, increasing by 6m;

    . Composition: upper section arm 6.5m, lower section arm 6.5m, middle section arm is 6m × 1, 11.5m × 2; The available lengths of fixed jibs are 13m, 19m, 24.5m, 30.5m, 36m, 42m; It can be installed on the main arm with a length of 32m~62m.


    Luffing jib

    . The two ends of the luffing jib are variable cross-section, and the middle is a space truss structure with equal cross-section. The steel pipes are welded, and the top and root of the jib are reinforced with steel plates, which is more conducive to load transmission;

    . The length of the luffing jib is between 24m and 60m, increasing by 6m;

    . Composition: upper section arm 6m, lower section arm 6m, middle section arm is 6m ×2, 12m ×3; the available luffing jib lengths are 24m, 30m, 36m, 42m, 48m, 54m, 60m respectively; it can be installed on the main arm with a length of 26m~62m.


    Boom tip pulley

    . Welded structure, connected to the main arm through a pin shaft, used for auxiliary hook operation.


    Hook


    Hook Name

    Maxi lifting weight

    Amount

    Number of pulleys

    Unit Weight (t)

    300t Hook

    300

    1

    11

    5.85

    200t Hook

    200

    1

    9

    3.69

    100t Hook

    100

    1

    3

    2.3

    50t Hook

    50

    1

    51

    1.7

    16t Hook

    16

    1

    -

    0.9


    Installation / working mode switch

    . In installation mode, some safety devices are not functional to facilitate crane installation;

    . In working mode, all safety limit devices are functional.


    Emergency stop

    . In an emergency, pressing the emergency stop button can cut off the power supply of the entire machine and stop all actions.

    Torque limiter

    . An independent safety control system completely controlled by a computer. The torque limiter can automatically detect the weight of the crane, the working radius and the angle of the boom, and display the rated load, actual load, working radius and boom angle. Under normal operation, it can intelligently judge and automatically cut off the dangerous direction of the crane, and has a black box function to record overload lifting information;

    . Composition: display, angle sensor, force sensor, etc.


    Main and auxiliary lifting anti-overwinding device

    . It is composed of a limit switch and a heavy hammer installed on the upper arm to prevent the lifting hook from overlifting. When the lifting hook is lifted to the upper limit, the limit switch is activated, the buzzer on the left control panel alarms, and the fault indicator light flashes, and the lifting action of the lifting hook is automatically cut off.


    Main and auxiliary lifting over-release prevention device

    . It consists of an action trigger device installed in the drum and a proximity switch to prevent the wire rope from being over-released. When the wire rope is released to the vicinity of the last three turns, the proximity switch is activated, the system alarms through the buzzer, displays the alarm information on the display, and automatically cuts off the lowering action of the winch.


    Function lock

    . If the function lock handle is not in place, all other function operating handles will be invalid, which can avoid misoperation caused by body collision when getting on or off the vehicle.

    Quality 1820t·M Crawler Cranes 62m+60m Luffing Jib For All Lifting Projects for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Shandong Tengfei Hoisting Engineering Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)