Sign In | Join Free | My himfr.com
Home > Used Crawler Crane >

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency from wholesalers
     
    Buy cheap 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency from wholesalers
    • Buy cheap 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency from wholesalers

    1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

    Ask Lasest Price
    Brand Name : XCMG
    Model Number : XLC220
    Price : Negotiable Price
    Payment Terms : L/C,T/T
    Supply Ability : Supply According to Customer Needs
    Delivery Time : According to Order Confirmation
    • Product Details
    • Company Profile

    1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

    220T Crawler Crane Can Play A Key Role In Heavy Machinery Handling And Improve Production Efficiency

    XLC220 Crawler Crane Technical Specifications


    Crawler crane models: XLC220
    Max rated lifting capacity: 220t
    Max lifting moment: 1239t.m


    Typical working conditions


    Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook


    Operating radius(m)


    Main boom length(m)

    17

    20

    23

    26

    29

    32

    35

    38

    41

    44

    47

    50

    5

    220.0












    6

    196.0

    192.0

    190.5

    179.0









    7

    177.0

    176.0

    174.5

    173.5

    167.0

    156.0

    144.0






    8

    154.5

    154.0

    153.5

    151.9

    147.3

    144.7

    138.2

    127.0

    115.0

    103.0



    9

    136.0

    136.0

    135.2

    133.4

    131.0

    127.0

    124.0

    121.0

    109.0

    103.0

    101.0


    10

    115.0

    115.0

    116.0

    116.0

    115.0

    112.0

    110.0

    107.0

    105.0

    102.0

    99.0

    91.0

    12

    87.5

    87.9

    88.2

    88.3

    88.4

    88.4

    88.4

    87.2

    85.5

    83.8

    82.2

    80.6

    14

    69.7

    70.2

    70.5

    70.6

    70.7

    70.7

    70.6

    70.6

    70.5

    70.3

    69.1

    67.8

    16

    57.4

    58.0

    58.3

    58.4

    58.5

    58.5

    58.4

    58.3

    58.3

    58.1

    58.0

    57.9

    18


    49.0

    49.3

    49.5

    49.6

    49.5

    49.5

    49.4

    49.3

    49.2

    49.1

    48.9

    20



    42.5

    42.6

    42.7

    42.7

    42.7

    42.6

    42.5

    42.4

    42.2

    42.1

    22




    37.2

    37.4

    37.3

    37.3

    37.2

    37.1

    37.0

    36.9

    36.7

    24




    32.8

    33.0

    33.0

    33.0

    32.9

    32.8

    32.6

    32.5

    32.3

    26





    29.3

    29.4

    29.4

    29.3

    29.2

    29.1

    28.9

    28.7

    28






    26.3

    26.3

    26.2

    26.2

    26.0

    25.9

    25.7

    30







    23.7

    23.7

    23.6

    23.5

    23.3

    23.1

    32







    21.5

    21.4

    21.4

    21.2

    21.1

    20.9

    34








    19.5

    19.4

    19.3

    19.2

    19.0

    36









    17.7

    17.6

    17.4

    17.3

    38










    16.0

    15.9

    15.8

    40










    14.7

    14.6

    14.4

    42











    13.3

    13.2

    44












    12.1

    Magnification

    18

    18

    16

    14

    13

    12

    11

    10

    9

    9

    8

    8


    Notes:

    1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

    2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


    Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook

    Operating radius(m)

    Main boom length(m)

    53

    56

    59

    62

    65

    68

    71*

    74*

    77*

    80*

    83*

    10

    85.4

    81.5

    78.5

    68.5








    12

    79.4

    77.9

    76.4

    66.5

    65.5

    62.6

    60.2

    55.0




    14

    67.0

    65.8

    64.6

    63.5

    62.3

    60.5

    58.5

    53.5

    48.8

    44.6

    40.8

    16

    57.6

    56.6

    55.7

    54.7

    53.8

    53.0

    52.0

    51.3

    47.4

    43.3

    39.7

    18

    49.1

    48.9

    48.7

    47.8

    47.0

    46.4

    45.5

    44.9

    44.1

    42.1

    38.5

    20

    42.2

    42.1

    41.9

    41.7

    41.5

    41.0

    40.2

    39.8

    39.0

    38.5

    37.4

    22

    36.8

    36.7

    36.5

    36.3

    36.1

    36.0

    35.8

    35.4

    34.8

    34.3

    33.7

    24

    32.5

    32.3

    32.1

    31.9

    31.7

    31.7

    31.4

    31.4

    31.2

    30.8

    30.2

    26

    28.9

    28.7

    28.5

    28.3

    28.1

    28.0

    27.8

    27.8

    27.5

    27.4

    27.2

    28

    25.9

    25.7

    25.5

    25.3

    25.1

    25.0

    24.7

    24.7

    24.5

    24.4

    24.1

    30

    23.3

    23.1

    22.9

    22.7

    22.5

    22.4

    22.2

    22.1

    21.9

    21.8

    21.5

    32

    21.1

    20.9

    20.7

    20.5

    20.3

    20.2

    19.9

    19.9

    19.7

    19.6

    19.3

    34

    19.1

    19.0

    18.8

    18.6

    18.4

    18.3

    18.0

    18.0

    17.7

    17.6

    17.4

    36

    17.4

    17.3

    17.1

    16.9

    16.7

    16.6

    16.3

    16.3

    16.0

    15.9

    15.7

    38

    15.9

    15.8

    15.6

    15.4

    15.1

    15.0

    14.8

    14.8

    14.5

    14.4

    14.2

    40

    14.6

    14.4

    14.2

    14.0

    13.8

    13.7

    13.4

    13.4

    13.2

    13.0

    12.8

    42

    13.4

    13.2

    13.0

    12.8

    12.6

    12.5

    12.2

    12.2

    12.0

    11.8

    11.6

    44

    12.3

    12.1

    11.9

    11.7

    11.5

    11.4

    11.1

    11.1

    10.9

    10.7

    10.5

    46

    11.2

    11.1

    10.9

    10.7

    10.5

    10.4

    10.1

    10.1

    9.9

    9.8

    9.5

    48


    10.2

    10.0

    9.8

    9.6

    9.5

    9.2

    9.2

    9.0

    8.8

    8.6

    50


    9.3

    9.2

    9.0

    8.8

    8.7

    8.4

    8.4

    8.1

    8.0

    7.8

    52



    8.4

    8.2

    8.0

    7.9

    7.6

    7.6

    7.4

    7.3

    7.0

    54




    7.5

    7.3

    7.2

    6.9

    6.9

    6.7

    6.6

    6.3

    56





    6.6

    6.5

    6.3

    6.3

    6.0

    5.9

    5.7

    58





    6.0

    5.9

    5.7

    5.7

    5.4

    5.3

    5.1

    60






    5.3

    5.1

    5.1

    4.9

    4.7

    4.5

    62







    4.6

    4.6

    4.3

    4.2

    4.0

    64








    4.1

    3.8

    3.7

    3.5

    66








    3.6

    3.4

    3.3

    3.0

    68









    2.9

    2.8

    2.6

    70










    2.4

    2.2

    Magnification

    7

    6

    6

    6

    5

    5

    5

    4

    4

    4

    4


    Notes:

    1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

    2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


    Quality 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Shandong Tengfei Hoisting Engineering Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)